Specialist Design, Facilitation & Installation

Falco supplies the telecommunications sector with specialist design, facilitation and installation of external infrastructure associated with fibre-optic cabling.

Early involvement in planning enables us to introduce innovative non-excavation techniques to access cabling ducts to maximise efficiency and minimise disruption to the local area. These includes directional drilling, anger bore, use of headings etc.

Our experienced Project Managers can liaise with all parties involved to provide a full turn-key solution for our clients’ fibre-optic needs.

Recent Telecoms Case Studies

  • Instalcom

    Client: Instalcom

Client Testimonial

Falco have provided an excellent service to Galliford Try. Our teams have worked well together to deliver on-programme and meet the needs of our client, stakeholders and Thames Water customers. Customer service has been excellent resulting in a number of written commendations from customers.

Andy Wolfe, Senior Project Manager, MGjv

Falco undertake works in a very professional manner delivering to the required quality and met the time and cost deliverables with an excellent safety culture throughout.

Mick Walsh, Construction Project Manager, Tideway Central

Falco’s team worked with ourselves and other third parties such as Drax in a very professional and competent manner to get work completed to Thames Water requirements.

Abi Elmhori, Project Manager, Agility Alliance KCD

We are so pleased with the new Pumping Station installation (FLIP) in Putney. What was a complex and difficult task involving planning issues, significant spoil removal and excavation in a confined space was swiftly completed by the team at Falco.

Carl Leadbeater, Head of Waste Networks, Thames Water

It is a great advantage for us to have a subcontractor with expertise in both power and water disciplines.

Mick Walsh, Construction Project Manager, Tideway Central

Falco discharged their duties with great care and professionalism. Their multi-disciplined team seamlessly accommodated fluctuations in programme and unexpected challenges that occurred during the Counters Creek project.

Kevin Parcell, Contract Director, Morrison Utilities Services

We were very impressed with Falco’s delivery of one of the more challenging cable installation projects we have commissioned. I would not hesitate to use them again.

Shaun Rulton, Senior Project Manager, Dunamis

Falco’s performance in delivering challenging projects within a tight timescale is outstanding. Their range skills and capabilities combined with an ability to overcome obstacles and devise innovative solutions are keys to its success. Their team’s ability to seamlessly manage a number of different stakeholders and interfaces to get-the-job-done is also extremely impressive.

Tony Harrage, Technical Coordinator FLIPS Team, Thames Water

We have been very impressed with the way Falco micro-managed a challenging programme of FLIPs installations in the Borough to minimise the disruption to the residents involved.

Lee Currie, Environmental Dept, Hammersmith & Fulham Council

Would you like to know more?

Get in touch with us today to find out how we can help with your project.